A Process takes inputs and transforms them into outputs, and may be connected to other Processes in process flows. The work of Technician experimental work contributes to This Process.

A Process happens in an organizational Context.
Context: The Project Sensor network project

IoT for industrial applications

This process is connected to other processes to fulfill a Work order.
Order: Work order 207 due: 2016-04-08

Previous processes:

This Process:

Milestone 2 - Feature #377 #413 Adding new sensors (vibration, sound and gland position) and R&D report starting 2016-04-08 ending 2016-04-08

Input requirements:

Time Contribution Technician experimental work 2.00 Time - Hours

Prepared a load cell using semiconductor composite material for testing, polished surface of electrodes. Tests on the device was performed the day after.
https://docs.google.com/document/d/114Yh4wwafFrznc56nY-msKRx0-TRofbD_v_QeH5E0bE/edit

Time Contribution Documenting 4.00 Time - Hours

(4H) Wrap everything up into a comprehensive document and link this information in other documents of the project
See doc
https://docs.google.com/document/d/1i3HYPrlQn_MXwi64jbpfnIdpup98mNJBNDbAoVxZUlc/edit

Time Contribution R&d electronics work 13.00 Time - Hours

Only for work on the Distance sensor

Hardware assembly
(4H) Connect selected hardware together as explained in solution outline and verify signals responds as expected

Software dev.
(1H) Create outline for software implementation
(5H) Interface the displacement sensor with the Sensor Node at the firmware level
(1H)Make adjustments to the cloud communication software in order to accommodate this new sensor.

Final testing
(3H) Test this new sensor in a real life situation with the rest of the system

See doc for estimations
https://docs.google.com/document/d/1i3HYPrlQn_MXwi64jbpfnIdpup98mNJBNDbAoVxZUlc/edit

Time Contribution R&d electronics work 1.00 Time - Hours

Only for work done on the Vibration sensor

Time Contribution Shopping work 3.00 Time - Hours
Time Contribution Information mining work 6.00 Time - Hours
Time Contribution Transportation work 1.00 Time - Hours
Time Contribution Training self work 1.00 Time - Hours

Output plans:

R&D report 1.00 Idea

Vibration and gland follower distance sensor

Resources created: