Process: p2p Bazar Crowdfunding starting 2016-03-28 ending 2016-04-16

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Work

Planned Work: (Requirements are ordered by due date)

Manual work: 1.00 Time - Hours due March 28, 2016
Unassigned
Event organizing work: 1.00 Time - Hours due March 28, 2016

Someone who organizes an event, like the Grand opening, logs time.

Unassigned
Presentation Conference (give) work: 1.00 Each due March 28, 2016
Unassigned
Work events:
March 29, 2016 2.00 Each Done by Valentin

Fin de présentation de MNI. Tout ok

Recruiting work: 1.00 Each due March 28, 2016

Here you log time recruiting new contributors to this video project.

Unassigned
Work events:
April 1, 2016 2.00 Each Done by Valentin

Meeting, travail sur plan straté de comm

March 28, 2016 1.00 Each Done by Tibi

Meeting with Adrian (Marketing).
Emails with Valentin, messaging and discussions with 99%media.
Communication to SENSORICA to attract participation.

Office work: 1.00 Time - Hours due March 28, 2016
Unassigned
Artistic work: 1.00 Time - Hours due March 28, 2016

This is where those who work on the video, shooting, editing, or sound log their time.

Unassigned
Work events:
Feb. 10, 2016 50.00 Time - Hours Done by Daniel

made a 3D model of the space, with furniture etc, and edited a 3D video rendering of it with animated people, plants, lights, details, etc.

Outreach-Marketing work: 1.00 Time - Hours due March 28, 2016
Unassigned
Work events:
April 26, 2016 2.00 Time - Hours Done by Jim

Preparing for social media campaign. Announced meeting. Created strategy document. https://docs.google.com/document/d/12X57zXtQzFgkoXpIHxVH_oPoi_I7_kOdOFb4hK0VjW4/edit?usp=sharing

March 29, 2016 1.00 Time - Hours Done by Valentin

Mail envoyé Hydro Québec, OKNF, Industrie Canada

Facilitation work: 1.00 Time - Hours due March 28, 2016
Unassigned
Work events:
May 16, 2016 0.25 Time - Hours Done by Tibi

Sent email to sensorica for the second phase of the crowdfunding campaign. some off-line coordination as well, for this next phase. We need to build momentum to shoot the video and for a sustained social media campaign.

https://groups.google.com/d/topic/sensorica/f-57Ns9h8_0/discussion

April 25, 2016 1.00 Time - Hours Done by ValentinK

Passed by the SENSORICA lab, spoke with Tibi about the video production, got some info about how it was going.

April 14, 2016 0.80 Time - Hours Done by Tibi

Facilitation for gathering materials for shooting the videos, my cousin, Sergiu, Valentin, documented in Trello and announced people.

Documenting: 1.00 Time - Hours due March 28, 2016

Anything related to documentation is logged here. For example, taking notes during a meeting, or during a Workparty, updating the Coordination doc, etc.
Documentation is VERY important in order to work stigmergically!!

Unassigned
Work events:
April 9, 2016 2.00 Time - Hours Done by Tibi

Updated Trello and the document, based on the work I did with Valentin G and Valentin K at the lab, on the story.

April 1, 2016 1.00 Time - Hours Done by Tibi

Consolidated all the documentation from previous crowdfunding campaigns, updated some docs, communicated all that to the crowdfunding team.

March 28, 2016 0.50 Time - Hours Done by Tibi

Created the Main coordination doc and shared it on the Calendar and Trello. I also posted it on the Facebook page of the 99%media community.
https://docs.google.com/document/d/1xsgUfMut-hr1wRFnFwQv_GLvLbT61fxrzDve7Ubsi0M/edit#heading=h.hpgl6laz7zrz

Administration work: 1.00 Time - Hours due March 28, 2016
Unassigned
Demo work: 1.00 Time - Hours due March 28, 2016
Unassigned
Writing work: 1.00 Time - Hours due March 28, 2016

This is about writing the storyline, the video script, etc.
Valentin and Valentin can log here.

Unassigned
Work events:
May 16, 2016 1.50 Time - Hours Done by Tibi

Worked with Valenting on scenes, materials for scenes, for the video.

May 16, 2016 1.50 Time - Hours Done by Valentin

Worked with Valenting on scenes, materials for scenes, for the video.

April 28, 2016 2.50 Time - Hours Done by Tibi

Did some work with Valentin G, Valentin K, Scott, Stephanie on the script for the video
https://docs.google.com/document/d/1GXVCXk8o43W7f08apJMplteUrjCWtD63L88Dd5UfAQ4/edit?ts=57225e7c#

April 28, 2016 2.50 Time - Hours Done by Valentin

Did some work with Tibi, Valentin K, Scott, Stephanie on the script for the video
https://docs.google.com/document/d/1GXVCXk8o43W7f08apJMplteUrjCWtD63L88Dd5UfAQ4/edit?ts=57225e7c#

April 28, 2016 2.50 Time - Hours Done by Scott

Did some work with Valentin G, Valentin K, Tibi, Stephanie on the script for the video
https://docs.google.com/document/d/1GXVCXk8o43W7f08apJMplteUrjCWtD63L88Dd5UfAQ4/edit?ts=57225e7c#

April 28, 2016 2.50 Time - Hours Done by Stephanie

Did some work with Valentin G, Valentin K, Scott, Tibi on the script for the video
https://docs.google.com/document/d/1GXVCXk8o43W7f08apJMplteUrjCWtD63L88Dd5UfAQ4/edit?ts=57225e7c#

April 28, 2016 2.00 Time - Hours Done by Valentin

Brainstorming for the Press release, with Tibi, Abran, Alfredo, Jim.
https://docs.google.com/document/d/1giOwHVPo6OkRqbihTBlTYRwsVtEzdkkTTWNRas6QXH4/edit#

April 28, 2016 2.50 Time - Hours Done by ValentinK

Did some work with Valentin G, Tibi, Scott, Stephanie on the script for the video
https://docs.google.com/document/d/1GXVCXk8o43W7f08apJMplteUrjCWtD63L88Dd5UfAQ4/edit?ts=57225e7c#

April 27, 2016 2.00 Time - Hours Done by Tibi

Brainstorming for the Press release, with Valentin, Abran, Alfredo, Jim.
https://docs.google.com/document/d/1giOwHVPo6OkRqbihTBlTYRwsVtEzdkkTTWNRas6QXH4/edit#

April 27, 2016 2.00 Time - Hours Done by Alfredo

Brainstorming for the Press release, with Tibi, Abran, Tibi, Jim.
https://docs.google.com/document/d/1giOwHVPo6OkRqbihTBlTYRwsVtEzdkkTTWNRas6QXH4/edit#

April 27, 2016 2.00 Time - Hours Done by Abran

Brainstorming for the Press release, with Valentin, Tibi, Alfredo, Jim.
https://docs.google.com/document/d/1giOwHVPo6OkRqbihTBlTYRwsVtEzdkkTTWNRas6QXH4/edit#

April 27, 2016 2.00 Time - Hours Done by Jim

Brainstorming for the Press release, with Valentin, Abran, Alfredo, Tibi.
https://docs.google.com/document/d/1giOwHVPo6OkRqbihTBlTYRwsVtEzdkkTTWNRas6QXH4/edit#

April 16, 2016 1.00 Time - Hours Done by Daniel

added my 2¢ to the p2p Bazaar Crowdfunding Campaign doc
little bit of text editing and many comments
https://docs.google.com/document/d/1xsgUfMut-hr1wRFnFwQv_GLvLbT61fxrzDve7Ubsi0M/edit#

April 14, 2016 1.50 Time - Hours Done by Tibi

Worked with Jim, Valentin and Chris on the story, the video. We documented stuff in the main doc.
https://docs.google.com/document/d/1xsgUfMut-hr1wRFnFwQv_GLvLbT61fxrzDve7Ubsi0M/edit#

April 11, 2016 2.00 Time - Hours Done by ValentinK

Read the documentation, added comments and video templates (script/technical breakdown)

Accounting and finance work: 1.00 Time - Hours due March 28, 2016

This is for people who do the budgeting, who take care of the NRP-VAS, who do the money distribution, etc. Mostly for CAKE administrators, or whoever else wants to help.

Unassigned
Work events:
March 28, 2016 0.50 Time - Hours Done by Tibi

Created this process for logging time, added comments, on order for people to know where to log, linked it in the Main coordination doc.

Transportation work: 1.00 Time - Hours due March 28, 2016
Unassigned
Information mining work: 1.00 Time - Hours due March 28, 2016
Unassigned
Analysis and strategy work: 1.00 Time - Hours due March 28, 2016
Unassigned
Work events:
April 22, 2016 2.00 Time - Hours Done by Tibi

Worked with Jim, Scott, Stephanie and Valentin on story, social media comm, etc.Send email to the group.

April 9, 2016 3.00 Time - Hours Done by Tibi

Worked with Valentin G and Valentin K on the message for the crowdfunding video.

April 5, 2016 1.00 Time - Hours Done by Abran

Discussed various ways to reach target audience. Contributed to the story telling portion as well as presented ideas about what perks we can use.

Documented in main p2p Bazaar crowdfunding google doc.

April 5, 2016 1.00 Time - Hours Done by Valentin

CF campaign with Abran and Tibi

Meeting work: 1.00 Time - Hours due March 28, 2016

You actively participate in a meeting? Log your time here.

Unassigned
Work events:
April 21, 2016 3.00 Time - Hours Done by YanickV

Participated and contributed to the first meeting, the whole team, mostly about Marketing.

April 21, 2016 1.50 Time - Hours Done by YanickV

Crowdfunding meeting with Jim, Tibi, Scott, Stéphanie and Valentin.

https://drive.google.com/file/d/0B5ujNRtKEf7eUGVULXNCV19EUFE/view?usp=sharing

April 21, 2016 2.00 Time - Hours Done by Jim

Crowdfunding meeting with Stephanie and others.

March 30, 2016 4.00 Time - Hours Done by Tibi

First meeting, mostly about marketing with the entire team.

My main role was documentation. Most of it went into the main coordination doc
https://docs.google.com/document/d/1xsgUfMut-hr1wRFnFwQv_GLvLbT61fxrzDve7Ubsi0M/edit#

I created a spreadsheet for calculating perks
https://docs.google.com/spreadsheets/d/1EPolWJ5Ny6b_epFQ0Tkgp-WKP6b_juIw0kWcwaTKGc4/edit

I created a Trello board
https://trello.com/b/GAiJvwFB/crowdfunding-video-for-renovating-and-launching-the-new-sensorica-montreal-lab

March 30, 2016 4.00 Time - Hours Done by Jim

Participated and contributed to the first meeting, the whole team, mostly about Marketing.

March 30, 2016 4.00 Time - Hours Done by Valentin

Meeting about CF

Shopping work: 1.00 Time - Hours due March 28, 2016
Unassigned
Business building work: 1.00 Time - Hours due March 28, 2016
Unassigned
Infrastructure development work: 1.00 Time - Hours due April 16, 2016

Building SENSORICA landing website

Unassigned
Work events:
April 13, 2016 1.00 Time - Hours Done by YanickV

Brainstormed with Valentin and Jim about website wireframe.
Added whiteboard contents to doc.
https://docs.google.com/document/d/11YG87expoEBj9YO_9mxHKgWshqPdQBLet85Ym_l7OVs/edit?usp=sharing

April 13, 2016 1.00 Time - Hours Done by Valentin

Brainstormed with Jim and Yannick about website wireframe.
Added whiteboard contents to doc.
https://docs.google.com/document/d/11YG87expoEBj9YO_9mxHKgWshqPdQBLet85Ym_l7OVs/edit?usp=sharing

April 13, 2016 2.00 Time - Hours Done by Jim

Created a live mockup for testing fullPage.js :
http://159.203.110.76/layout.html
fullPage.js repo:
https://github.com/alvarotrigo/fullPage.js
Also tested pagePiling.js:
https://github.com/alvarotrigo/pagePiling.js/

April 13, 2016 1.00 Time - Hours Done by Jim

Brainstormed with Valentin and Yannick about website wireframe.
Added whiteboard contents to doc.
https://docs.google.com/document/d/11YG87expoEBj9YO_9mxHKgWshqPdQBLet85Ym_l7OVs/edit?usp=sharing

April 12, 2016 2.00 Time - Hours Done by Jim

Explored SVG for the web:
Exported sensorica logo to SVG format in illustrator.
https://github.com/Sensorica/website/blob/master/svg/sensorica_logo.svg
Followed this great tutorial:
https://www.elegantthemes.com/blog/resources/how-to-create-an-animated-logo-with-svg-and-css
Discovered an SVG optimization tool
http://petercollingridge.appspot.com/svg-optimiser

April 12, 2016 1.00 Time - Hours Done by Jim
April 12, 2016 2.00 Time - Hours Done by Jim

Discovered paper.js and decided to make a project landing page.
http://paperjs.org/about/
Really had fun with this one!
http://159.203.110.76/

April 11, 2016 4.00 Time - Hours Done by Jim

Spent some time getting ideas for the website.
http://www.awwwards.com/
Looked at various stock photography websites to get inspiration for images.
https://www.stocksy.com/
Researched front end javascript frameworks.
Here is a great list:
https://github.com/showcases/front-end-javascript-frameworks

April 9, 2016 2.00 Time - Hours Done by Tibi

Worked on Javascript to push some data from our Google CRM to the new landing website. Coordinated with Jim on this.

April 9, 2016 1.00 Time - Hours Done by Jim

Helped Tibi with google API

April 7, 2016 5.00 Time - Hours Done by Jim

-Set up a digital ocean droplet with UBUNTU 14.04 LTS
-Installed and configured NGINX webserver
-Tested and learned some basic functionality of d3,js
https://d3js.org/

Process context:

Pattern: Funding initiative
Context: Renovation Montreal lab
Order: Work order 206 due: 2016-04-16

Previous processes:

Next processes: