Process: Renovations work and Lab (space) starting 2016-03-01 ending 2016-03-01

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Space Lab 1.00 Area - square meters due March 1, 2016

Work

Planned Work: (Requirements are ordered by due date)

Work - Accounting and Finance: 1.00 Time - Hours due March 1, 2016
Unassigned
Work - Documenting: 1.00 Time - Hours due March 1, 2016
Unassigned
Work - Artistic: 1.00 Time - Hours due March 1, 2016
Unassigned
Work - Facilitation and coordination: 1.00 Time - Hours due March 1, 2016
Unassigned
Work - Writing: 1.00 Time - Hours due March 1, 2016
Unassigned
Work - Transportation: 1.00 Time - Hours due March 1, 2016
Unassigned
Work events:
June 25, 2016 1.00 Time - Hours Done by Tibi

Transported furniture donated by M. King from his house to the lab.

June 25, 2016 1.00 Time - Hours Done by FrancoisE

transported furniture from my house to the lab with Tibi.

April 3, 2016 0.80 Time - Hours Done by Tibi

Went to Home depot to buy materials for the renovation, gyprock for the back wall.
Paid with CAKE money.
Went with Scott.

April 3, 2016 0.80 Time - Hours Done by Scott

Went to Home depot to buy materials for the renovation, gyprock for the back wall.
Paid with CAKE money.
Went with Tibi.

Work - Shopping: 1.00 Time - Hours due March 1, 2016
Unassigned
Work events:
March 2, 2016 1.00 Time - Hours Done by mikecohen

Purchased $196.35 worth of kumber and hardware at home depot (see budget spread sheet for details and trello board for picture of receipts)

Went with Dan on Friday, Feb 26th 2016

March 1, 2016 0.50 Time - Hours Done by Marisa

I have some equipment to donate to the new lab relating to and not limited to:

Aquaponics/hydroponics: tubing, mesh, water pumps etc
Computers/Server equipment
Seeds for seed catalogue if interested

Work - Meeting: 1.00 Time - Hours due March 1, 2016
Unassigned
Work events:
March 25, 2016 1.00 Time - Hours Done by Tibi

Met with Graham and a few sensoricans to work out the governance between organizations in the space. This was a very productive meeting, I am going to share the results with the community.

March 25, 2016 1.00 Time - Hours Done by mikecohen

Met and discussed governance for renos, rent cost for P3 desks, Sensorica coin and more

Work - Administration: 1.00 Time - Hours due March 1, 2016

I can start or add to a Google Doc with spreadsheets. Vas newbie

Taken by Marisa
Work - Manual: 1.00 Time - Hours due March 1, 2016
Taken by Marisa
Work events:
Nov. 9, 2016 2.00 Time - Hours Done by Tibi

Cleaned and arranged stuff in the lab.

Nov. 8, 2016 1.50 Time - Hours Done by Tibi

Cleaned in the lab and installed a desk in the Incubator

Oct. 19, 2016 1.00 Time - Hours Done by Shahin

Worked with Tibi, Humberto at the lab, cleaning and rearranging stuff.

Oct. 19, 2016 2.50 Time - Hours Done by mikecohen

Worked with Tibi, Raza at the lab, cleaning and rearranging stuff.

Oct. 19, 2016 4.00 Time - Hours Done by Humberto

Worked with Tibi, Raza and Mike at the lab, cleaning and rearranging stuff.

Oct. 19, 2016 5.50 Time - Hours Done by Raza

Worked with Tibi, Humberto and Mike at the lab, cleaning and rearranging stuff.

Oct. 19, 2016 8.00 Time - Hours Done by Tibi

Worked with Raza, Humberto and Mike at the lab, cleaning and rearranging stuff.

Aug. 24, 2016 5.00 Time - Hours Done by Humberto

Worked with Pov in making the list of electrical parts and updating the budget for electrical work. Help Tibi with the door installation.

Aug. 24, 2016 5.00 Time - Hours Done by Povilas

Worked with Humberto on Making a shopping list for electrical work.

Aug. 24, 2016 5.00 Time - Hours Done by Tibi

Worked with Pov and Humberto at the lab.
Installed a door to the electrical room, and placed a gyprock panel.
Other minor things as well...

July 27, 2016 5.00 Time - Hours Done by Humberto

Electrical wiring and outlets planning. Electical wiring for the north wall and outlet for bathroom. Helping with the installation of service room's door. Organizing, cleaning.

July 27, 2016 6.00 Time - Hours Done by Tibi

Worked with Humberto and Pov. Built the door frame around the electrical room and other little things around.

July 21, 2016 8.50 Time - Hours Done by Tibi

Built walls in kitchen and around the electrical room. Also helped others in their activities. I was there with Grahan, Pov, Humberto, Jim, ...

July 20, 2016 7.00 Time - Hours Done by Povilas

Helped to install walls for the kitchen area, lining up the electric cables, construction of shelves for tools.

July 20, 2016 4.00 Time - Hours Done by Humberto

Electrical wiring for the kitchen the center and the south wall.

July 20, 2016 5.00 Time - Hours Done by Jim

Cleaned up the ethernet cables that were dangling everywhere, relocated the router/switch and moved the phone as well that was going offline often.
Helped Tibi build walls.

July 13, 2016 1.00 Time - Hours Done by Povilas

Participated in installing the bathroom door.

July 13, 2016 5.00 Time - Hours Done by Humberto

Helping to install bathroom door. Electrical wiring for the bathroom. Organizing cables, cleaning

July 13, 2016 5.00 Time - Hours Done by Jim

Cleaned up construction area. Reorganized tools. Tidied up entrance. Moved construction materials in electrical room.

July 6, 2016 8.00 Time - Hours Done by Tibi

Renovations at the lab

July 6, 2016 2.00 Time - Hours Done by Jim

Helped Tibi and King to put vinyl flooring

July 6, 2016 6.00 Time - Hours Done by Povilas

Sorted out the electric cables, assembled the blue bookcase, brought some pallets to the roof, helped to tidy up the space.

July 6, 2016 4.00 Time - Hours Done by Humberto

Helping to install the toilet. Cleaning and organizing the space

June 29, 2016 4.00 Time - Hours Done by Humberto

Helping to build the bathroom and the sink cabinet. Cleaning and organizing the space

June 29, 2016 5.00 Time - Hours Done by Jim

Built stairs for the bathroom out of palettes. Great success!

June 29, 2016 3.00 Time - Hours Done by Povilas

Worked on building a cabinet for the sink in the bathroom.

June 25, 2016 1.50 Time - Hours Done by FrancoisE

Worked with Tibi on the bathroom, we put up some green gyrock on the walls.

June 25, 2016 1.50 Time - Hours Done by Tibi

Worked with FrancoisE on the bathroom, we put up some green gyrock on the walls.

June 22, 2016 6.00 Time - Hours Done by Povilas

Clean up the space, sort out the tool&equipment. Helped with building the bathroom.

June 22, 2016 4.00 Time - Hours Done by Humberto

Helping to build the bathroom. Cleaning and organizing the space

May 26, 2016 4.00 Time - Hours Done by Valentin

Cleaning the lab after painting and moving stuff around.

May 26, 2016 4.00 Time - Hours Done by Jim

Cleaning the lab after painting and moving stuff around.

May 26, 2016 4.00 Time - Hours Done by Tibi

Cleaning the lab after painting and moving stuff around.

May 21, 2016 8.00 Time - Hours Done by Tibi

Painting the lab.

May 21, 2016 8.00 Time - Hours Done by Jim

Painting the lab.

May 21, 2016 8.00 Time - Hours Done by Graham

Painting the lab.

May 21, 2016 8.00 Time - Hours Done by Scott

Painting the lab.

May 21, 2016 5.00 Time - Hours Done by mikecohen

Painting the lab.

May 21, 2016 8.00 Time - Hours Done by FrancoisE

Painting the lab.

April 26, 2016 6.00 Time - Hours Done by Tibi

Worked with Graham on the bathroom floor, we almost installed it. We need now to install the plumbing in order to finish it completely.

April 26, 2016 6.00 Time - Hours Done by Graham

Worked with Tibi on the bathroom floor, we almost installed it. We need now to install the plumbing in order to finish it completely.

April 22, 2016 1.50 Time - Hours Done by Tibi

put ciment on entry stairs and repaired 2 brick blocks for the bathroom floor.

April 19, 2016 6.00 Time - Hours Done by Tibi

Arranged in the lab. Cleared the incubator area, placed desks.
Finished to brake the palets into individual pieces of wood.
I left a few that we are probably going to use.

April 18, 2016 5.50 Time - Hours Done by YanickV
April 14, 2016 1.00 Time - Hours Done by YanickV
April 11, 2016 1.00 Time - Hours Done by Scott

Helped move equipment around with Tibi.

I also helped to install a wireless router for Sensorica. I tried hooking it up to the LAN and seeing if we could connect to the internet. You can connect a device to the router, however you cannot connect to the internet. I suspect you need to be plugged into the modem coming from the ISP.

April 6, 2016 1.50 Time - Hours Done by YanickV

Prepare back wall before paint, put the frame of the wall (under the stair) with Tibi.
https://drive.google.com/file/d/0B5ujNRtKEf7eVFV4YjZpcFVuMzQ/view?usp=sharing

April 3, 2016 5.00 Time - Hours Done by mikecohen

Finished putting the back wall the Montreal lab, with Tibi. Putting gyprock up, plastering. Even extended the wall.
https://www.youtube.com/watch?v=kfeOOsPrHz8&feature=youtu.be

April 3, 2016 3.50 Time - Hours Done by Scott

Put gyprock wall up in the back of the lab. Worked with Tibi.

April 3, 2016 3.50 Time - Hours Done by Tibi

Put gyprock wall up in the back of the lab. Worked with Scott.

April 3, 2016 5.00 Time - Hours Done by Tibi

Finished putting the back wall the Montreal lab, with Mike. Putting gyprock up, plastering. Even extended the wall.
https://www.youtube.com/watch?v=kfeOOsPrHz8&feature=youtu.be

April 3, 2016 1.00 Time - Hours Done by Bruce

Finished putting the back wall the Montreal lab, with Tibi and Mike. Putting gyprock up, plastering. Even extended the wall.
https://www.youtube.com/watch?v=kfeOOsPrHz8&feature=youtu.be

March 25, 2016 2.00 Time - Hours Done by Tibi

Worked with Mike on the walls. We finished the back wall and built another one for the electrical room. Discussions about renovations.

March 25, 2016 2.00 Time - Hours Done by mikecohen

Finished the back wall and started the electrical room wall with Tibi

March 1, 2016 0.00 Time - Hours Done by Marisa

Unplanned Work:

Work event: Work - Transportation 1.00 Time - Hours May 19, 2016 Done by mikecohen

Picking up extra paint from Rona on St-Laurent and Home Depot on Beaubien

Process context:

Pattern: Infrastructure physical dev
Context: Renovation Montreal lab

Previous processes:

Next processes: