Process: BG Device to BG Device starting 2015-08-10 ending 2015-12-31

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

R&D report @Prototyping stage 1.00 Idea due Aug. 25, 2015

Work

Planned Work: (Requirements are ordered by due date)

Work - Engineering: 23.00 Time - Hours due Aug. 18, 2015

Assembling and testing of prototype.

Taken by Tibi
Work events:
Sept. 9, 2015 0.50 Time - Hours Done by Tibi

Programming Arduino for testing the first prototype.
worked with Fabio and John, his last day at the lab.

Sept. 7, 2015 0.75 Time - Hours Done by Tibi

I completed documentation for the first prototype in the doc
https://docs.google.com/document/d/1jm4ABNG3PXb0Cf5myxK4EWHEss4eMbUzJ9ZBH1KDYSM/edit#

I soldered the LED with John.

I also communicated with Jim for sharing the Arduino code and for integration of the LED in the code.

Work - R&D electronics: 50.00 Time - Hours due Aug. 25, 2015

Develop electronics prototypes for the first prototype. Use this to log the work done during the first hackathon organized at SENSORICA.

Taken by Tibi
Work events:
Nov. 28, 2015 5.00 Time - Hours Done by Jim

Worked on SD card and Arduino pro mini and bluetooth for new prototype during second hackathon. Fabio, Tibi and Thomas were there.

Sept. 18, 2015 4.00 Time - Hours Done by Jim

Began testing nRF0001 breakout board for adding BLE and wireless functionality.
Added detailed documentation of the process to BG-5 Doc.
https://docs.google.com/document/d/1jm4ABNG3PXb0Cf5myxK4EWHEss4eMbUzJ9ZBH1KDYSM/edit?usp=sharing

Sept. 12, 2015 0.00 Time - Hours Done by Tibi
Sept. 11, 2015 2.00 Time - Hours Done by Jim

Cleaned up code and change outputed variable over serial to interface with game.

Aug. 30, 2015 2.00 Time - Hours Done by Jim

Worked a little past midnight :) Developed a working proof of concept with the materials in the lab and modified code from a pong game on the Processing platform..

Aug. 30, 2015 3.00 Time - Hours Done by Jim

Researched more on instrumentation amplifiers and updated electronics section in doc
https://docs.google.com/document/d/1wwSkFX25vaqH7Z9Wy-z3wg5SdP1yomlSdjuIfIRyzX4/edit

Aug. 29, 2015 5.00 Time - Hours Done by Tibi

Worked with Jim on the electronics during our first hackathon. I also build a parts list.
https://docs.google.com/document/d/1wwSkFX25vaqH7Z9Wy-z3wg5SdP1yomlSdjuIfIRyzX4/edit#

Aug. 29, 2015 5.00 Time - Hours Done by Jim

Worked with Tibi on the electronics during our first hackathon. I also build a parts list.
https://docs.google.com/document/d/1wwSkFX25vaqH7Z9Wy-z3wg5SdP1yomlSdjuIfIRyzX4/edit#

Unplanned Work:

Work event: Work - Programming software 1.50 Time - Hours Nov. 28, 2015 Done by Tibi

Discussions about data structure for the second prototype during the second hachathon. Fabio, Jim and Thomas were there.

Work event: Work - Shopping 2.00 Time - Hours Nov. 28, 2015 Done by Jim

Shopping for parts at Abra, for second hackathon. Traffic plus in store time. Used my own car.

Work event: Work - Information mining 2.00 Time - Hours Nov. 27, 2015 Done by Tibi

Searching for parts for the second prototype, for the second hackathon.

Work event: Work - Artistic 2.00 Time - Hours Sept. 6, 2015 Done by johndanger

Editing video of the process of creation
https://www.youtube.com/watch?v=kGhaD0n7Jtg
Original footage by Daniel

Work event: Work - Artistic 12.00 Time - Hours Sept. 3, 2015 Done by johndanger

- Modeling 3D the device's box
- infography for newspaper Enfants Quebec article

Work event: Work - Meeting 0.50 Time - Hours Aug. 29, 2015 Done by Tibi

Meeting before the first hackathon at SENSORICA for hardware development. This was a coordination meeting, to decide what we are going to work on during the day.

Work event: Work - Meeting 0.50 Time - Hours Aug. 29, 2015 Done by thomas.daguenel

Meeting before the first hackathon at SENSORICA for hardware development. This was a coordination meeting, to decide what we are going to work on during the day.

Work event: Work - Meeting 0.50 Time - Hours Aug. 29, 2015 Done by Yannick

Meeting before the first hackathon at SENSORICA for hardware development. This was a coordination meeting, to decide what we are going to work on during the day.

Work event: Work - Meeting 0.50 Time - Hours Aug. 29, 2015 Done by johndanger

Meeting before the first hackathon at SENSORICA for hardware development. This was a coordination meeting, to decide what we are going to work on during the day.

Work event: Work - Meeting 0.50 Time - Hours Aug. 29, 2015 Done by Jim

Meeting before the first hackathon at SENSORICA for hardware development. This was a coordination meeting, to decide what we are going to work on during the day.

Process context:

Pattern: Generic R&D
Context: Breathing Games
Order: Work order 170 for BG Device due: 2015-09-01

Previous processes:

Next processes: