Process: Make ArtrOrica 3D printer prototype and R&D report and Conditions for project and 3D printer prototype starting 2014-07-08 ending 2014-07-31

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Prototype Material - 3D printer 1.00 Each due July 31, 2014

The R&D report - work in progress

Completed: produces 1.00 Each Aug. 28, 2014
  Resource: Prototype Material - 3D printer: ArtrOrica 3D printer 1.00 Each
Completed: produces 1.00 Each Aug. 28, 2014
  Resource: Prototype Material - 3D printer: ArtrOrica R&D report 1.00 Each
Prototype Material - 3D printer 1.00 Each due July 31, 2014

Prototype of ArtrOrica 3D printer. This is a resource used in SENSORICA Montreal lab

Document - Conditions for project 1.00 Idea due July 31, 2014

Bill of materials for the printer.

Completed: produces 1.00 Idea Aug. 28, 2014
  Resource: Document - Conditions for project: ArtrOrica bill of materials 1.00 Idea

Work

Planned Work: (Requirements are ordered by due date)

Work - R&D mechanics: 10.00 Time - Hours due July 31, 2014

Fabricate a xy stage driven by 2 stepper motors.
Proposition: use 2 stages from a CD rom.
Use Polulu stepper motor driver from 3D printer, ask Serge.

Taken by Tibi
Work - Technician experimental: 1.00 Time - Hours due July 31, 2014
Unassigned
Work - R&D mechanics: 20.00 Time - Hours due July 31, 2014

Taches de travail pour Jean Guy, pour monter l'imprimante avec Serge et Tibi.

Taken by Jean-Guy
Work events:
July 16, 2014 1.05 Time - Hours Done by Jean-Guy

Fait lignes pour pre-percage pour la plaquette de l"extruder.

Work - Documenting: 100.00 Time - Hours due July 31, 2014

This is a place for Kaven to log his time for:
R&D report: Documenting the ArtrOrica 3D printer.
https://docs.google.com/document/d/1aeeG9JbX90hP0RLv4s6SIB3twHQTg5JvzS3c_V1fmt4/edit#
Bill of materials: Edit a complete bill of materials
https://docs.google.com/spreadsheets/d/1F1GJ9L3XXN5_eNYiZy87bhjPXPMOPTXNtjbKn8IQeos/edit#gid=184706214
User manual: Assembly of kit, fine tuning and alignment
Document to be created!!
Manufacturing: Recipe
To be created with Tibi!!
Testing and quality control
Document to be created and associated with the R&D report!!!

Taken by Kaven Joyal
Work events:
Aug. 29, 2014 5.00 Time - Hours Done by Kaven Joyal

Planning to task concerning the documentation of ArtrOnica 3D printer.

1) Listing (quantity, price,...
2) Add picture of printed pieces
3) Add picture of piece bought (where, how much)

Unplanned Work:

Work event: Work - R&D mechanics 1.50 Time - Hours July 8, 2014 Done by Jean-Guy

Tibi et Jean-Guy ont monte le systeme de rails avec les nouvelles pieces imprimes.
Ils n’ont pas installe la plaque d’alluminium pour l’extrudeur, car nous ne connaissons pas les dimensions des vis que Serge veut utiliser.
https://docs.google.com/document/d/1aeeG9JbX90hP0RLv4s6SIB3twHQTg5JvzS3c_V1fmt4/edit#

Work event: Work - R&D mechanics 1.50 Time - Hours July 8, 2014 Done by Tibi

Worked with Jean-Guy on the 3D printer prototype. At the same time, I also worked on the Micro 3D printer.
Tibi et Jean-Guy ont monte le systeme de rails avec les nouvelles pieces imprimes.
Ils n’ont pas installe la plaque d’alluminium pour l’extrudeur, car nous ne connaissons pas les dimensions des vis que Serge veut utiliser.

I also did documentation for this new work, created main doc, linked to webpage, send email to Serge. .

https://docs.google.com/document/d/1aeeG9JbX90hP0RLv4s6SIB3twHQTg5JvzS3c_V1fmt4/edit#

Usable Inputs

Space Lab: 1.00 Time - Hours due July 8, 2014

This prototype was assembled and tested in SENSORICA Montreal lab

Onhand: Space - Frederic D's lab 200.00 Area - square meters
Onhand: Space - Makxim's lab 100.00 Area - square meters
Onhand: Space - Phil's lab 25.00 Area - square meters
Onhand: Space - SENSORICA Montreal lab 250.00 Area - square meters
Used: Space - SENSORICA Montreal lab 120.00 Time - Hours Aug. 28, 2014 by ArtrOrica project
Onhand: Space - SENSORICA Robotics lab 1000.00 Area - square meters

Process context:

Pattern: Generic R&D
Context: ArtrOrica project

Previous processes:

Next processes: