Process: Design a low cost long range piezo stack starting 2013-12-09 ending 2013-12-31

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Design Mechanical - Manipulator actuator 1.00 Idea due Dec. 31, 2013

Work

Planned Work: (Requirements are ordered by due date)

Unplanned Work:

Work event: Work - Design mechanical 9.00 Time - Hours Oct. 5, 2014 Done by Luciano

Worked with Tibi and others on mechanical design and applications of the low-cost piezo buzzer manipulator.
https://docs.google.com/document/d/1XLrD_v9Dzb44Z3LHlM3RX1UnG22Lh_Sww4oyrUSrMyc/edit#

Work event: Work - Design mechanical 5.00 Time - Hours Oct. 5, 2014 Done by Tibi

Worked a bit during several days with Luciano and others in the design and prototype document for the low-cost piezo buzzer manipulator
https://docs.google.com/document/d/1XLrD_v9Dzb44Z3LHlM3RX1UnG22Lh_Sww4oyrUSrMyc/edit#

Work event: Work - Design mechanical 2.00 Time - Hours Dec. 31, 2013 Done by Tibi

Worked with Antonio to do the design

Work event: Work - Design mechanical 5.00 Time - Hours Dec. 31, 2013 Done by Daniel

3D design on the casing for 3D printing

Work event: Work - Design mechanical 2.00 Time - Hours Dec. 31, 2013 Done by Antonio

Spent 2 hours with Tibi, brainstorming about this design.