Process: Green Wall prototype for the Sensorica lab starting 2019-01-11 ending 2019-01-31

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Design 1.00 Idea due Jan. 31, 2019
Completed: produces 1.00 Idea Jan. 11, 2019
  Resource: Design: Green Wall design - Sensorica lab prototype 1.00 Idea
Prototype 1.00 Each due Jan. 31, 2019

Work

Planned Work: (Requirements are ordered by due date)

Work - Shopping: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
Jan. 23, 2019 1.00 Time - Hours Done by Tibi

Online shopping - PVC pipe fittings, made a list / table in the design doc.
Bruce and I decided to work with 2" PVC pipes.

Jan. 11, 2019 1.50 Time - Hours Done by Tibi

Went with Bruce to Home Depot to identify parts for the green wall, after design session.

Jan. 11, 2019 1.50 Time - Hours Done by Bruce

Went with Tibi to Home Depot to identify parts for the green wall, after design session.

Work - R&D electronics: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - Documenting: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
Jan. 15, 2019 1.00 Time - Hours Done by Tibi

Worked on the design doc: design considerations and design features for electronics, mechanics and software. Share it with the community.

Work - Manual: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - Meeting: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - R&D mechanics: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
Jan. 27, 2019 2.00 Time - Hours Done by Tibi

Made experimental single pot. self watering (wick) + fan integrated for air circulation for air purification through the roots. Sent pic to Bruce.
https://photos.app.goo.gl/cD6EptpTDBGtSy9h7

Jan. 23, 2019 0.70 Time - Hours Done by Tibi

Searched CNC wood joints on Internet, communicated with Daniel about the design, provided feedback on the first draft 3D model.

Jan. 11, 2019 3.00 Time - Hours Done by Bruce

Worked with Tibi at the Sensorica lab on design consideration of the green wall.

Jan. 11, 2019 3.00 Time - Hours Done by Tibi

Worked with Bruce at the Sensorica lab on design consideration of the green wall.

Work - Information mining: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
Jan. 22, 2019 1.00 Time - Hours Done by Tibi

Searched for air pumps, found more plant-based air purification projects, searched for open source communities and contacted one of them.

Work - Writing: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - Facilitation and coordination: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - Recruiting: 1.00 Time - Hours due Jan. 11, 2019
Unassigned

Citations

Design

Usable Inputs

Space Lab: 1.00 Area - square meters due Jan. 11, 2019
Onhand: Space - Frederic D's lab 200.00 Area - square meters
Onhand: Space - Makxim's lab 100.00 Area - square meters
Onhand: Space - Phil's lab 25.00 Area - square meters
Onhand: Space - SENSORICA Montreal lab 250.00 Area - square meters
Onhand: Space - SENSORICA Robotics lab 1000.00 Area - square meters

Process context:

Pattern: Generic R&D
Context: LED green wall
Order: Work order 281 , Green Wall prototype for the Sensorica lab due: 2019-01-31

Previous processes:

Next processes:


Process notes:

Design and prototype a green wall for the Sensorica lab.

We document the development here

https://docs.google.com/document/d/1y-k6o0i5y-kEWjnsvqxxM8-_L9KO8gnI9ZAsq0UWX48/edit#heading=h.kplafotfi4nr