Process: Moving the lab with EVA starting 2018-06-25 ending 2018-06-29

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Work

Planned Work: (Requirements are ordered by due date)

Work - Manual: 1.00 Time - Hours due June 25, 2018
Unassigned
Work events:
June 30, 2018 0.50 Time - Hours Done by Tibi

Met with Hadi at the old lab location, he wanted to pick up some left over stuff from there, and bring it to his home. These were things belonging to Praxeco. I had the key, needed to open the lab and help him charge the stuff in his car.

June 30, 2018 1.50 Time - Hours Done by Bruce

Rearranged things in the new lab space, with Tibi

June 29, 2018 2.00 Time - Hours Done by Tibi

Rearranged things in the new lab space, with Dardan and Bruce

June 27, 2018 10.00 Time - Hours Done by Tibi

Wen to pick up the truck in the morning. Worked with Pov, Bruce and Alex to load and unload. Coordinated the event. Brought the track back.

June 27, 2018 8.00 Time - Hours Done by Alex Dicu

Helped for moving the lab. Worked with Tibi, Bruce and Pov

June 27, 2018 8.00 Time - Hours Done by Bruce

Helped for moving the lab. Worked with Tibi, Pov and Alex

June 27, 2018 8.00 Time - Hours Done by Povilas

Helped for moving the lab. Worked with Tibi, Bruce and Alex

Work - Transportation: 1.00 Time - Hours due June 25, 2018
Unassigned
Work events:
June 27, 2018 2.00 Time - Hours Done by Tibi

Used my own car for get the truck and bring it back in Lachine/Montreal (Note: not easy to get a truck this time of the year, when everyone in moving in Montreal.). Lots of traffic.

Process context:

Pattern: Infrastructure physical dev
Context: Building SENSORICA
Order: Work order 273 due: 2018-06-29

Previous processes:

Next processes:


Process notes:

Moving the Sensorica lab, temporarily, until we have the funding for the Verdun project.
Moving with Eva.coop