Incoming Exchanges for Project Infrastructure-physical
Incoming total: 5000.00 Outgoing total: 0
* Note these totals are meaningful only if the events selected all use the same currency.
Export CSV File

Filter the List

All in the date range

Exchange Type

Cash Contribution

Donation

Expense

Loan

Material Contribution

Purchase