Contributions for Project Access
 
Date Type From Resource Type Qty URL Description Process Deliverables
Sept. 13, 2016 Time Contribution Tibi Work - Facilitation and coordination 1.60 HR Coordinated between eVision, Living Labs and SENSORICA in order to postpone the demo. Had 2 phone conversations with Louise, one with Jim and a few emails exchanges. Project responsable
Sept. 13, 2016 Time Contribution FrancoisE Work - Meeting 0.50 HR Discussed with Tibi and Mike about going to eVision to pick up Jim's work. Project responsable
Sept. 12, 2016 Time Contribution Jim Work - Meeting 1.00 HR Meeting with dhafir about state of the project. Discussed that I need a break. Coordinated with other stakeholders. Project responsable
Sept. 9, 2016 Time Contribution mikecohen Work - Programming software 5.00 HR Testing the api.js element to communicate with the Kaba saflok server over local network. (Socket library) Blockchain stack
Sept. 8, 2016 Time Contribution mikecohen Work - Programming software 5.00 HR Testing at evision of message constructor with Jim and Claude. Understanding the Kaba implementation of Longitudinal Redundancy Check for message validity. Blockchain stack
Sept. 6, 2016 Time Contribution mikecohen Work - Information mining 3.50 HR Met with Jim and Claude at Evision to get caught up with the Saflok API and the project progress / next step of dev and planning demo Blockchain stack
Sept. 1, 2016 Time Contribution Humberto Work - Writing 3.00 HR Contribution for the technical document: Made some changes suggested by Jim. Added an introduction to Consensus and wrote some paragraphs about PoW, PoS and Tendermint. Final Documentation
Aug. 30, 2016 Time Contribution Jim Work - Meeting 3.00 HR Meetings with evision for the week Project responsable
Aug. 26, 2016 Time Contribution Humberto Work - Writing 4.00 HR Working mostly in the definition and explanation of cryptography concepts. Also some basic description of the Merkle and Patricia trees used in the Block. Final Documentation
Aug. 26, 2016 Time Contribution Jim Work - Meeting 0.50 HR Exchanges with Claude, Abdel and Guy on the progress of the API Project responsable
Aug. 26, 2016 Time Contribution Jim Work - Writing 2.00 HR Addes sections and more commenting. Final Documentation
Aug. 25, 2016 Time Contribution Jim Work - Writing 1.00 HR Jumped in to comment on work done already and added a few sections with bullet points to outline the document. Final Documentation
Aug. 25, 2016 Time Contribution Jim Work - Meeting 0.50 HR Meeting with Dhafir to discuss possible next steps and future applications. Project responsable
Aug. 25, 2016 Time Contribution Tibi Work - Writing 2.50 HR Worked mostly on the Introduction part. Did some formatting. Inserted some sections in order to well represent SENSORICA, its OVN structure and model. I also stressed on referencing, asked collaborators to add links to sources of inspiration. Discussions around this document with other collaborators. https://docs.google.com/document/d/19WDz99TU2SOEw0p29SgDMi56wwACxlU48YF82LOUzLg/edit# Final Documentation
Aug. 18, 2016 Time Contribution Jim Work - Information mining 1.00 HR Dug deeper into the myths of Serial over GPIO for Raspberry Pi 3. Best explanation to changes made: http://spellfoundry.com/2016/05/29/configuring-gpio-serial-port-raspbian-jessie-including-pi-3/ Blockchain stack
Aug. 17, 2016 Time Contribution Jim Work - Administration 1.00 HR Created space and process for final documentation Project responsable
Aug. 2, 2016 Time Contribution Jim Work - Information mining 10.00 HR Scraped Eris #slack channel for information and links that might be pertinent to final documentation. Took the initiative as Eris has been the leading source of valuable information and tools for this project. Created this document: https://drive.google.com/open?id=1dEIgkC2beVXZzfZjfTwcZF5c63cbxOq7VgvVLn6DQJI Final Documentation
Aug. 1, 2016 Time Contribution Jim Work - Accounting and Finance 2.00 HR Calculated second distribution Project responsable
July 28, 2016 Time Contribution Jim Work - Meeting 5.00 HR Created spreadsheet for project distribution: https://docs.google.com/spreadsheets/d/1D0M0kxTNcKcZcJjR79w1ucGfY3fsU46m9eVIk19eV3A/edit?usp=sharing Project responsable
July 25, 2016 Time Contribution Jim Work - Programming software 5.00 HR Initial tests with KABA system. Communication over TCP/IP established. Wrote some code for testing messages. Still buggy. Will continue on system installed in eVision VPN. https://github.com/Sensorica/Interspace-Access/tree/master/SAFLOK Blockchain stack
July 25, 2016 Time Contribution Jim Work - Meeting 1.00 HR Meeting with Dhafir, Claude and Louise at eVision. Discussed scope of POC, project status and future grant for development. Agreed to add a two week extension to project. Project responsable
July 22, 2016 Time Contribution FrancoisE Work - Programming software 6.00 HR Generic driver deploy https://docs.google.com/document/d/18vaBcOYxHgvhRjLoJPDKGQXQl3LByVbliZidS5TTWC8/edit?usp=sharing Blockchain stack
July 22, 2016 Time Contribution FrancoisE Work - Programming software 5.00 HR Virtualbox deploy https://docs.google.com/document/d/18vaBcOYxHgvhRjLoJPDKGQXQl3LByVbliZidS5TTWC8/edit?usp=sharing Blockchain stack
July 22, 2016 Time Contribution FrancoisE Work - Programming software 8.00 HR Multi nodes chains and reverse ssh tunneling https://docs.google.com/document/d/18vaBcOYxHgvhRjLoJPDKGQXQl3LByVbliZidS5TTWC8/edit?usp=sharing Blockchain stack
July 19, 2016 Time Contribution Jim Work - Programming software 1.00 HR Found solution to docker service not starting after upgrade and reboot. Reported in forum: http://crm.sensorica.co/t/join-the-docker-revolution/225/3 Blockchain stack