Contributions for Project FabMobile
 
Date Type From Resource Type Qty URL Description Process Deliverables
Sept. 12, 2015 Time Contribution Ahmed Analysis and strategy work 1.00 HR - Writing document E_03_FabLab 3D Printer Get contracts to build fablabs in schools
Sept. 8, 2015 Time Contribution Ahmed Analysis and strategy work 1.00 HR Writing the document E_02_FabLab CNC Machine Get contracts to build fablabs in schools
Sept. 7, 2015 Time Contribution Ahmed Analysis and strategy work 4.00 HR - Writing the document E_01_FabLAB Laser Cutter - Writing the document I_03_Documents Tree Get contracts to build fablabs in schools
Sept. 6, 2015 Time Contribution Ahmed Analysis and strategy work 3.00 HR Gathering information about existing FabLabs Get contracts to build fablabs in schools
Aug. 22, 2015 Time Contribution Ahmed Analysis and strategy work 2.00 HR - Writing the main topics of the "FabLAB Initiation Document" - Basic list of available CEGEP Get contracts to build fablabs in schools
Sept. 4, 2014 Time Contribution Tibi Accounting and finance work 1.00 HR Open Worked on the VAS for the second course. It needed some adaptation. I worked more than one hour, but I also logged time as Infrastructure development for SENSORICA, because part of this work is also generic. In all I spent 6 hours on improving the value equation.
Sept. 1, 2014 Time Contribution Tibi Infrastructure development work 1.50 HR worked on the VAS for the second event
Aug. 31, 2014 Time Contribution Sonja Business building work 0.25 HR Communication with the organizer of the Foire Commerciale de la rentree
Aug. 30, 2014 Time Contribution Tibi Event organizing work 9.00 HR Organized the Mobile event on Mont-Royal, from morning to night, with Daniel and Sonja
Aug. 30, 2014 Time Contribution Daniel Event organizing work 9.00 HR Mount-Royal street event
Aug. 30, 2014 Time Contribution Sonja Event organizing work 4.00 HR Day 2, set up and break-down of FabMobile and representation at booth
Aug. 29, 2014 Time Contribution Tibi Event organizing work 14.50 HR Organized the Mobile event on Mont-Royal, from morning to night, with Daniel and Sonja
Aug. 29, 2014 Time Contribution Ethienne Business building work 4.00 HR Went to FabMobile for outreach and recruiting members to the 3D course.
Aug. 29, 2014 Time Contribution Daniel Event organizing work 14.50 HR Mount-Royal street event
Aug. 29, 2014 Time Contribution Sonja Event organizing work 3.00 HR Day 1, set up and break-down FabMobile; plus making and printing of advertisement signs
Aug. 27, 2014 Receive Tibi Canadian Dollars 151.19 CAD There are 4 bills, from different local stores in one. These are mix materials, including gas.
Aug. 27, 2014 Time Contribution Tibi Artistic work 0.03 HR worked on prints for the FabMobile event. I needed to update some flyers, make french versions.
Aug. 27, 2014 Time Contribution Tibi Shopping work 0.07 HR Shopping for FabMobile stuff, shelf, plastic board, electrical cables, prints for outreach, ... This is just the time log. $ will be logged separately.
Aug. 27, 2014 Give Tibi Canadian Dollars 151.19 CAD There are 4 bills, from different local stores in one. These are mix materials, including gas.
Aug. 26, 2014 Time Contribution Daniel Artistic work 8.00 HR Open Designing and 3D printing stuff for the Fab Mobile event 2
Aug. 24, 2014 Time Contribution Tibi Administration work 3.00 HR Open Organized the event Mont-Royal Foire Commercial. I also created a Meetup event, a SENSORICA event and invited communicated the event.
Aug. 24, 2014 Time Contribution Tibi Outreach-Marketing work 0.75 HR Outreach for the Mont-Royal Foire Commerciale event on social media.
Aug. 21, 2014 Time Contribution Sonja Business building work 0.83 HR Open Follow-up for Street Sale on Mont-Royal; we have a spot for the FOIRE COMMERCIALE
Aug. 5, 2014 Time Contribution Sonja Business building work 1.00 HR Open August 4 and 5: contacted Le Plateau Montreal (see document) by phone to follow up on past email; fill out and send back documents to apply to form part of the 'Foire', follow up on phone to inquire documents were correct received 'FOIRE COMMERCIALE DE LA RENTRÉE - du 28 au 31 août 2014'
Aug. 4, 2014 Time Contribution Tibi Business building work 0.50 HR Worked with Sonja for arranging another FabMobile event