Contributions for Project LED green wall
 
Date Type From Resource Type Qty URL Description Process Deliverables
Jan. 30, 2019 Receive Tibi Currency - Canadian Dollars 236.80 CAD Buy growing media materials for early experimentation for the green wall.
Jan. 30, 2019 Receive Bruce Currency - Canadian Dollars 30.01 CAD
Jan. 27, 2019 Time Contribution Tibi Work - R&D mechanics 2.00 HR Made experimental single pot. self watering (wick) + fan integrated for air circulation for air purification through the roots. Sent pic to Bruce. https://photos.app.goo.gl/cD6EptpTDBGtSy9h7 Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 23, 2019 Time Contribution Tibi Work - Shopping 1.00 HR Online shopping - PVC pipe fittings, made a list / table in the design doc. Bruce and I decided to work with 2" PVC pipes. Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 23, 2019 Time Contribution Bruce Work - Shopping 3.00 HR Shopping for plant growing materials with Tibi http://www.sensorica.co/home/what-we-do/projects/sensor-technology-to-support-local-food-systems/greensense/led-green-walls/green-walls---announcements/buildingagreenwallatthesensoricamontreallab Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 23, 2019 Time Contribution Tibi Work - Shopping 3.00 HR Shopping for plant growing materials with Bruce http://www.sensorica.co/home/what-we-do/projects/sensor-technology-to-support-local-food-systems/greensense/led-green-walls/green-walls---announcements/buildingagreenwallatthesensoricamontreallab Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 23, 2019 Time Contribution Tibi Work - R&D mechanics 0.70 HR Searched CNC wood joints on Internet, communicated with Daniel about the design, provided feedback on the first draft 3D model. Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 22, 2019 Time Contribution Tibi Work - Information mining 1.00 HR Searched for air pumps, found more plant-based air purification projects, searched for open source communities and contacted one of them. Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 15, 2019 Time Contribution Tibi Work - Documenting 1.00 HR Worked on the design doc: design considerations and design features for electronics, mechanics and software. Share it with the community. Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 11, 2019 Time Contribution Bruce Work - R&D mechanics 3.00 HR Worked with Tibi at the Sensorica lab on design consideration of the green wall. Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 11, 2019 Time Contribution Tibi Work - R&D mechanics 3.00 HR Worked with Bruce at the Sensorica lab on design consideration of the green wall. Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 11, 2019 Time Contribution Bruce Work - Shopping 1.50 HR Went with Tibi to Home Depot to identify parts for the green wall, after design session. Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
Jan. 11, 2019 Time Contribution Tibi Work - Shopping 1.50 HR Went with Bruce to Home Depot to identify parts for the green wall, after design session. Green Wall prototype for the Sensorica lab Design: Green Wall design - Sensorica lab prototype
April 18, 2014 Time Contribution Tibi Work - Meeting 1.00 HR discussed with Benoit about place to build the Green Wall, space, rent, and other problems related to the project and its place in SENSORICA.
March 31, 2014 Time Contribution Tibi Work - Meeting 2.00 HR Open General meeting for the poject.
Jan. 28, 2014 Time Contribution Tibi Work - Writing 2.00 HR Open Worked with Benoit on the description and needs of the Green Wall project.
Dec. 11, 2013 Time Contribution Tibi Work - Meeting 3.00 HR Went to Ste-Julie with Benoit to meet Roland and Norman to discuss the project. Roland will contribute with 3D design.
Dec. 10, 2013 Time Contribution Tibi Work - Business building 1.50 HR Communication, added a few things on the website, communicated with Nikita for participation in water filtration/sterilization...
Dec. 5, 2013 Time Contribution Tibi Work - Infrastructure development 2.30 HR Open worked on the website page, creatd VAS page, created a sister page on JAM website and propagate the project on social media
Dec. 4, 2013 Time Contribution Tibi Work - Meeting 2.00 HR Open Meeting organized by Benoit with Les Genies du Nouveau Monde
Nov. 14, 2013 Time Contribution Tibi Work - Business building 1.50 HR Open Started project with Benoit, discussed about VAS, incentives, governance, created document, created project in VAS, etc.