All Contributions
Date Type From Project Resource Type Qty URL Description Process Deliverables
May 24, 2017 Time Contribution Tibi Verdun Work - Meeting 1.00 HR Met with Alicia, Stacey and the other assistant of David in Verdun. The meeting was more about bringing Alicia up to speed with the project. She is replacing Stacey. Alex could not go but he was informed. Initiating the Verdun project
May 24, 2017 Time Contribution Tibi Verdun Work - Recruiting 4.00 Each 4 phone / video / online meetings with ENSPIRAL, p2p Foundation, SAJE, La Ruche to tell them about our project, find how they can fit in, what's in it for them, and asked to produce a letter of support. They are all interested. This has been documented in the Updates doc. https://docs.google.com/document/d/1Xjz0C0opJ9qMf2svd2d-etTdpiZwcMYdenf9iilQtYA/edit# Initiating the Verdun project
May 19, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 7.00 HR Firmware. Added solenoid and fluid level. Feature #845
May 18, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 6.00 HR Firmware and did GF wiring. Feature #845
May 16, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 7.00 HR Documentation and Firmware ( RPM sensor) Feature #845
May 15, 2017 Time Contribution Povilas Sensor network Work - Documenting 5.00 HR Preparing material for wiring instructions on redmine. Feature #845
May 14, 2017 Time Contribution Tibi Building SENSORICA Work - Writing 1.00 HR Helped https://plus.google.com/+ChristianKreutz write an article about SENSORICA, based on an interview in 2016 with me, in Amsterdam. We went back and forth on this ons a few times before, today I finalized it.
May 12, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 5.00 HR Prepared a plan for wiring. Feature #845
May 11, 2017 Time Contribution Povilas Sensor network Work - R&D electronics 5.00 HR Firmware, configuring timers for 1-wire library. Feature #845
May 9, 2017 Time Contribution Povilas Sensor network Work - R&D electronics 7.00 HR Testing board, working on firmware. Feature #845
May 8, 2017 Time Contribution Povilas Sensor network Work - R&D electronics 7.00 HR Tests, debugging nodes and firmware. Feature #845
May 7, 2017 Time Contribution Tibi Verdun Work - Business building 0.50 HR Send emails to some high profile potential partners, the p2p foundation and Le Chantier de l'Economie Sociale, calling for a meeting in order to wrote a support letter for the Verdun project. Initiating the Verdun project
May 7, 2017 Time Contribution Tibi Building SENSORICA Work - Office 0.25 HR Logged Tim Sandgren into SENSORICA, provided access to everything. I also initiated communication and oriented him on what to work.
May 5, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 6.00 HR Finished soldering nodes. Feature #845
May 4, 2017 Time Contribution Povilas Sensor network Work - Documenting 1.00 HR Documenting bugs and observations. Feature #845
May 4, 2017 Time Contribution Tibi Infrastructure-virtual Work - Infrastructure development 1.50 HR Worked more on cleaning up the NRP, at the Resource Type level. I also solved an issue with the Sensor Network value equation, Pov has problems that were introduced by the NRP changes I am doing.
May 4, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 3.00 HR Soldering additional nodes (2/3). Feature #845
May 4, 2017 Time Contribution Tibi Verdun Work - Business building 1.50 HR Sent email to SENSORICA and many other SENSORICA partners and enthusiasts from around the world and also local. After this email I am exchanging emails with some of them, for explaining the project and for having them write support letters. Initiating the Verdun project
May 4, 2017 Time Contribution Povilas Sensor network Work - R&D electronics 3.00 HR New node tests, started migrating code for new hardware. Feature #845
May 4, 2017 Time Contribution Tibi Building SENSORICA Work - Meeting 3.00 HR Met with Andrew from Vancouver. He is working with companies and Universities, building consortia with them and trying to connect that with open networks and communities. He came for advice from us and to see how we can collaborate.
May 3, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 9.00 HR Firmware, soldering of new node. Feature #845
May 2, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 9.00 HR Firmware development. Feature #845
April 28, 2017 Time Contribution Tibi Verdun Work - Analysis and Strategy 2.50 HR Worked with Stacey on the budget on the phone, adapted it for 5 year plan. Initiating the Verdun project
April 28, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 3.00 HR Firmware (1-wire temp sensors) Milestone 2 - Task 416 - Create other sensor nodes
April 27, 2017 Time Contribution Povilas Sensor network Work - Technician experimental 7.00 HR Firmware (Analog to digital converter, internal and ADC IC) Milestone 2 - Task 416 - Create other sensor nodes